Marathon Gold Reports Additional Positive Drill Results From The Sprite Corridor At The Valentine Gold Project

Results Include 8.06 g/t Au over 14.0m, 8.03 g/t Au over 12.0m, 2.44 g/t Au over 24.0m, 1.79 g/t Au over 21.0m and 2.39 g/t Au over 11.0m


more on globenewswire.com